首頁 >> 公司新聞 >>施工必看 >> 保溫砂漿施工是否帶抗裂砂漿的兩種做法
详细内容

保溫砂漿施工是否帶抗裂砂漿的兩種做法

时间:2016-07-18     作者:www.vfeqvs.com【原创】   阅读

基本上與預拌抹灰砂漿類似,不過其厚度要根據隔熱保溫的要求來進行設定。另外,根據保溫砂漿的抗裂性能,設置一道抗裂加強罩面砂漿,以滿足裝飾、保溫功能的要求。

Basically similar to the ready-mixed mortar plastering, but the thickness is to be set according to the requirement of the heat preservation. In addition, according to the thermal insulation mortar anti-cracking performance, set up a crack to strengthen the surface mortar, in order to meet the requirements of decoration, heat preservation function.


(1)需要帶抗裂保護層的普通保溫砂漿施工流程舉例:

(1) the need to bring ordinary insulation mortar anti-cracking layer construction process, for example:

①清理墻面,保證無疏松物及油脂、脫模劑等不利粘結的材料;

(1) clear metope, ensure no loose objects and the bad bonding material such as grease, release agent;


②涂刷界面劑,可視情況使用預拌砂漿界面處理劑或使用成膜性或非成膜性的乳液界面處理劑,一般情況下,高吸收性基面使用非成膜性的乳液界面處理劑,低吸收性基面使用成膜性的乳液界面處理劑;

(2) besmear brushs interface agent, visual interface treatment agent or use into the use of ready-mixed mortar membranous or non film forming emulsion interface treatment agent, in general, high absorbent base using non film emulsion interface treatment agent, low absorbing base using film forming emulsion interface treatment agent;


③吊垂直、套方正、找規矩,具體要求參照抹灰砂漿施工規范進行;

(3) vertical, founder, find rules, specific requirements reference to plaster mortar construction specifications;


④抹第一遍保溫砂漿;

(4) to put on first pass thermal insulation mortar;


⑤找直、找平、找方正;

(5) find straight, leveling, find founder;


⑥彈分格、分層線;

6。 Play frame, layering, line;


⑦抹第二遍保溫砂漿;

All landowners with second time thermal insulation mortar;


⑧處理分層、分格縫;

End processing layer, frame joint;


⑨壓入網格布,抹抗裂砂漿;

Pet-name ruby grid cloth, wipe the anti-crack mortar;


⑩抹罩面抗裂砂漿;刮膩子一刷涂料一驗收。

Attending wipe the surface cracking mortar; Blow be bored with child a brush paint a acceptance。


(2)無需抗裂保護層的優質保溫砂漿施工方法流程:

(2) no crack layer quality construction method of insulation mortar process:


①根據墻面設計要求,分層操作。抹灰前基層表面要用線墜檢查垂直及平整度,套方找規矩。按墻面尺寸、灰層厚度沿踢腳線上面用保溫砂漿貼灰餅子,灰餅厚度較設計的墻體總厚度留出罩面層砂漿的厚度,做好灰餅后,在標準灰餅附近墻面釘上釘子,拴掛平直線,貼中間灰餅,其水平豎向

(1) according to the design requirements for metope, layered operation。 Plaster surface at the grass-roots level to thread before falling check vertical and flatness, set to find the rules。 According to the size of metope, gray layer thickness along the line that play a base above ash cake with thermal insulation mortar, ash cake thickness more design of wall thickness of total set aside to cover the thickness of cement mortar on the surface, after completes the ash cake, on the standard gray cake near the wall nail nails, fastened flat line, middle gray cake, the vertical level

間距在1.2~1.5m,并在窗口垛角處做灰餅。

The spacing between 1。2 ~ 1。5 m, and in the window Angle do ash cake。


②用與灰餅相同的砂漿在相鄰兩塊灰餅問豎直方向先抹出一長條梯形灰埂,其寬度為10cm左右,厚度與灰餅相同,作為墻面沖筋的標志。

(2) with the grey bread in the adjacent two pieces of the same mortar grey ask the vertical direction to wipe out a long trapezoidal grey piece, its width is about 10 cm, the thickness is the same as grey bread, as a symbol of metope screed。


③沖筋后2~4h抹底灰(需視材料的具體初凝時間而定),抹底灰時由下往上,不要超過1cm厚,用力要均勻,比抹混合砂漿時用力要輕,使灰層不要過實,保持好灰層內輕質骨料的空隙,保證保溫效果,又使砂漿與磚墻粘結牢固,待底灰上墻4~6h(需視材料的具體初凝時間而定)后可接著抹中層灰。操作時抹至稍高于沖筋厚度。然后用平直木壓條沿沖筋壓刮平整,對凹陷處應馬上補抹相同的保溫砂漿,再用平直木壓條刮平整,緊接著用木磨板搓抹一遍,使砂漿表面平整密實。

(3) screed after 2 ~ 4 h with bottom ash (depending on the materials of concrete initial setting time), when the bottom ash from down to up, not more than 1 cm thick, the strength should be uniform, the strength should be lighter, than when mixed mortar with don't real, the ash layer to maintain good light aggregate voids in the ash layer, guarantee the heat preservation effect, and make strong mortar and brick wall binding, stay on the bottom ash wall 4 ~ 6 h (depending on the materials of concrete initial setting time) can be then wipe after middle gray. Operation to slightly higher than screed thickness. Then use straight wood bead along the screed pressure level, the cavity should immediately fill the same thermal insulation mortar, with a flat wooden bead formation, and then use wood grinding plate rolling again, make mortar surface leveling &compaction.


④墻面的陰角處先用方尺上下核對方正,然后用陽角抹子上下抹壓找平,使四角方正。

(4) the internal Angle of metope place with feet first and check the founder, and then use Yang Angle float up and down pressure leveling, make the corners of founder.


⑤待中層砂漿達到初凝:一般中層灰上墻4~6h后(需視材料的具體初凝時間而定)開始抹罩灰面。

(5) to middle mortar to initial setting: general middle ash on the wall after 4 ~ 6 h (depending on the materials of concrete initial setting time) began to cover gray face.


⑥若遇到混凝土底層或加氣磚墻要先用界面處理劑處理后,再抹保溫砂漿。罩面灰按設計要求,總的來說以薄為宜。從陰角或陽角開始,橫向或縱向抹一層,與中層結合牢固,在初凝后抹平壓實,使表面細膩光滑。

6 if encountered bottom or aerated concrete brick wall after treated with interface treatment agent, covered with thermal insulation mortar. Cover face ash according to the requirements of design, overall with thin advisable. Starting from the Angle of Yin or Yang Angle, horizontal or vertical layer, combined with middle and firm, after the initial setting screeding compaction, exquisite and smooth surface.

以下產品    詳細咨詢18832673888   進入網站查看詳細情況

 

保溫砂漿 www.vfeqvs.com

硅酸鹽板

阿里巴巴華東官網

阿里巴巴華東分店 huadong.1688.com


最新评论
請先登錄才能進行回復登錄
  • 电话直呼

    • 18831662333
    • 銷售經理 :
    • 售前咨詢 :
    • 售前咨詢 :
    • 售后服務 :
    • 售后服務 :
    • 合同簽訂/施工方案 :
    • 合同簽訂/施工方案 :
  • 掃一掃,關注旺鋪

广西快乐十分 网赚导师是真的假的 天津11选5 网赚项目下载 江苏快3 中文点击网赚新手入门 网赚导师是真的假的 什么都不会怎么网赚 网赚是真的还是假的 湖北快3走势