我公司主要生產無機保溫砂漿、玻化微珠保溫砂漿、珍珠巖保溫砂漿、聚苯顆粒保溫砂漿、硅酸鹽保溫砂漿、硅酸鎂保溫砂漿,歡迎前來選購

首頁 >> 公司新聞 >>施工必看 >> 玻化微珠保溫砂漿施工步驟及注意事項
详细内容

玻化微珠保溫砂漿施工步驟及注意事項

时间:2016-07-18     作者:www。hdbwsj。com【原创】   阅读

膨脹玻化微珠保溫砂漿是以膨脹玻化微珠為輕質骨料與膨脹玻化微珠保溫膠粉料按照一定的比例攪拌均勻混合而的用于外墻內外保溫的一種新型無機保溫砂漿材料。膨脹玻化微珠保溫砂漿具有優異的保溫隔熱性能和防火耐老化性能、不空鼓開裂、強度高、現場施工加水攪拌即可使用。

Vitrified beads insulation mortar is expansion vitrified beads for light aggregate and vitrified beads insulation powder material according to certain proportion mixing evenly mixed and used for internal and external wall thermal insulation material of a new type of inorganic thermal insulation mortar. Vitrified beads insulation mortar with excellent heat preservation and heat insulation and fire resistance to aging performance, no empty drum cracking, high intensity, site construction and water mixing can be used.


一、膨脹玻化微珠保溫砂漿施工步驟:

A, vitrified beads insulation mortar construction steps:


1、基層處理:墻面應清理干凈,無油、無浮塵等。舊墻面松動、風化部分剔除干凈,表面凸起部分≥10mm應鏟平。

1, the basic level processing: metope should be clean, no oil, no dust and so on. Old metope loose parts, weathering clean, bumps on the surface of the 10 mm or higher should be razed.


2、砼梁柱或加氣砼等墻體基層必需用砼界面劑一遍。

2, concrete beams or aerated concrete wall at the grass-roots level required with concrete interface agent again.


3、吊垂直,套方找規矩,彈厚度控制線,按設計要求厚度用膨脹玻化微珠保溫砂漿作標準厚度沖筋。

3, vertical, set to find the rules, play thickness control line, according to the requirements of design thickness by expansion vitrified microsphere, as a standard thickness of insulation mortar screed.


4、拌:膨脹玻化微珠外墻保溫砂漿與水必須按【1:(1~1。1)】的重量比,先將水放入攪拌容器中,再將保溫砂漿放入攪拌使用。

4, mix: expansion vitrified microsphere, exterior wall thermal insulation mortar and the water must be 1 (1 ~ 1.1) 】 【 weight ratio, first put water in a mixing container, then into the mixing use of insulation mortar.


5、送料上墻粉刷,每遍厚度在20㎜內,第二遍間隔在24小時以上。

5, feeding on the wall painting, each times thickness within 20 ㎜, second time interval within 24 hours.


6、保溫層固化干燥后(一般的48小時)方可進行抹聚合物抗裂砂漿,首層應鋪貼雙層網格布。

6, insulation dry curing (general) 48 hours before being polymer anti-crack mortar, first floor should be double grid cloth.


7、釬網網格布按樓層間豎尺寸事先載好,網格布包邊應剪掉。

7, brazing wire mesh grid cloth according to the size of floor between the vertical load well in advance, and the grid cloth edge should be cut off.


8、抹聚合物抗裂砂漿厚度約3~4㎜,抹完一定寬度立即用鐵抹子壓入另一側,嚴禁干搭。

8, polymer anti-crack mortar with thickness of about 3 ~ 4 ㎜, finished with a certain width immediately with iron float into the other side, it is strictly prohibited to dry.


9、網格布之間搭接寬度不應小于50㎜,當壓入一側,再抹一些抗裂砂漿壓入另一側,嚴禁干搭。 

9, grid cloth lap width should be not less than 50 ㎜, when pressed into the side, add some anti-crack mortar pressure into the other side, it is strictly prohibited to dry.


10、網格布鋪貼要平整,無褶皺,砂漿飽滿度應達到100%。

10, grid cloth shop is stuck to level off, without fold, mortar plumpness should reach 100%.


11、窗口處均應翻包收口處理,應在窗口四角應力集中部位附加200㎜×400㎜的玻釬進行加強處理。

11, the window should be compacted in convergent processing, should be in the window corners of stress concentration place additional 200 ㎜ x 400 ㎜ intensive processing of bo qian.


12、外保溫體系與門、窗框間作防水處理。

12, external thermal insulation system with door and window frames intercropping waterproof processing.


13、分隔縫按照設計要求及建筑物里面效果圖,彈線后用壁紙刀及專用工具沿線開出設定的凹槽。

13, separating seam according to the design requirements and buildings in rendering, after the bomb line with wallpaper knife and special tool set out along the grooves。


14、凹槽使用聚苯乙烯或圓棒加防水膠嵌縫劑嵌成相應凹縫。

14, groove using polystyrene or round bar to add waterproof glue sealing agent is embedded into the corresponding groove joint.


15、要求陰陽角方正,凹槽平整,縫與平面抹灰同時進行,網格布搭接在縫中部。

15, requirements of Yin and Yang Angle founder, grooves flat, seam and surface rendering at the same time, the grid cloth lap seam in the middle.


16、瓷磚面作法:把網格布改成熱鍍鋅絲網加錨固釘,其它一樣。

16, ceramic tile surface approach: add anchor pin grid cloth into hot dipped galvanized wire mesh and other。


二、膨脹玻化微珠保溫砂漿施工注意事項:

Second, expanding vitrified beads insulation mortar construction matters needing attention:


1、料漿必須即配即用,配制好的料漿應在2H內用完,嚴禁二次加水使用。

1, the slurry must match box, namely preparation good slurry should be finished within 2 h, the secondary water use is forbidden.


2、配制的抗裂砂漿須攪拌5分鐘,必須攪拌均勻。

2, preparation of anti-crack mortar shall stir for 5 minutes, must mix.


3、配制的抗裂砂漿必須在1~2小時內使用完畢。

3, preparation of anti-crack mortar must be within 1 ~ 2 hours after use.

以下產品    詳細咨詢18832673888   進入網站查看詳細情況

 

保溫砂漿 www.vfeqvs.com

硅酸鹽板

阿里巴巴華東官網

阿里巴巴華東分店 huadong。1688。com


最新评论
請先登錄才能進行回復登錄
  • 电话直呼

    • 18831662333
    • 銷售經理 :
    • 售前咨詢 :
    • 售前咨詢 :
    • 售后服務 :
    • 售后服務 :
    • 合同簽訂/施工方案 :
    • 合同簽訂/施工方案 :
  • 掃一掃,關注旺鋪

2019任务网赚日赚100 2019最新网赚器 网赚月入过万是真的吗 金旋网赚 网赚大巴 19年网赚app 网赚兼职 网赚论坛大全 2019网赚0撸羊毛 在家上网赚点小钱